Supply of boilers for power units — steam boilers and auxiliary boiler equipment (deaeration columns, storage tanks) were supplied as part of the equipment for the backup boiler house, which provides heat for the facilities under construction and meets process needs during construction and commissioning.
Meteorological tower installation — work was completed to install the meteorological tower at the NPP construction site. The structure was installed in compliance with design elevations and requirements for the placement of meteorological equipment, which collects environmental data (wind speed and direction, temperature, humidity, and atmospheric pressure) necessary for monitoring meteorological conditions during all stages of construction and subsequent operation of the plant.
Meteorological tower dismantling — following the completion of active construction, dismantling work was completed, including removal of the meteorological tower structures, their disassembly, and preparation for relocation/disposal in accordance with site safety requirements and environmental regulations.